CN

Energy Storage Solutions

Energy Storage SolutionsScenario Pain Points

Difficult New Energy Consumption

Wind and solar new energy power generation has volatility and intermittency, with low consumption rate;

Insufficient Energy Storage Peak Shaving

Power grid peak shaving lacks long-period, large-capacity energy storage methods;

Unstable Remote Power Supply

Unstable power supply in remote areas, urgent demand for emergency power supply;

Technical Configuration

Wind and solar new energy power generation has volatility and intermittency, with low consumption rate; power grid peak shaving lacks long-period, large-capacity energy storage methods; unstable power supply in remote areas

  • icon

    Independently developed hydrogen production system adapts to wind and solar power fluctuations

  • icon

    Hydrogen storage enables long-period storage (several months)

  • icon

    Fuel cells quickly convert gas to electricity to respond to grid demand

Qingdao West Coast New Area PV Coupled Hydrogen Production Pilot Project

Implementation Cases

Qingdao West Coast New Area PV-hydrogen pilot project, equipped with 1Nm³/h mobile hydrogen production and refueling unit, connected to 100kW photovoltaic power station. The feasibility of the "PV-Electricity-Hydrogen-Electricity" mode has been verified, providing a replicable model for distributed wind-solar hydrogen production.

  • 1Nm³/h

    Mobile Hydrogen Production & Refueling Unit

  • 100kW

    Connected PV Power Station